Fire at a scrap metal recycling plant in Torrejón de Velasco

  • Fire broke out in the early hours at a recycling plant on the M-404, in the municipality of Torrejón de Velasco.
  • Twelve fire crews from the Community of Madrid have worked on two large piles of processed scrap metal.
  • The fire has been contained in two sectors and is under control with no injuries.
  • SUMMA 112 has remained in the area as a precaution while a large emergency operation was being coordinated.

Fire at recycling plant in Torrejón de Velasco

Un fire at a recycling plant A fire that broke out in the early hours of Saturday at a recycling plant located in the municipality of Torrejón de Velasco, south of the Community of Madrid, has forced the deployment of a significant emergency response in the area of ​​kilometer 31 of the M-404 highway. The fire originated inside the facilities dedicated to the treatment of scrap metal, generating a large plume of smoke visible from several points in the surrounding area.

As reported Emergency services 112 of the Community of MadridThe alert was received around 6:15 a.m. and, from that moment, an operation was activated in which the following have participated: multiple firefighting and sanitary resourcesDespite the magnitude of the incident, no injuries have been reported and the fire is under control, although the firefighters' work has continued for hours to ensure complete extinguishment.

Origin of the fire and characteristics of the affected plant

Fire at scrap metal recycling facility

The fire has broken out in a scrap metal recycling plant Located next to the M-404, a road that connects various municipalities in southern Madrid, the facilities are organized into sectors separated by concrete blocks. This design helps to compartmentalize the materials and, in situations like this, limits the spread of flames between different storage areas.

According to data provided by the emergency services, the fire has been concentrated in two large piles of processed scrap metalwith an approximate volume of 1.500 cubic meters. This type of material, once compacted and piled into large stacks, can generate internal heat sources and hinder firefighting efforts, as the fire can be hidden among the layers of metal and accumulated waste.

The concrete-sectioned structure has proven key in contain the fire within specific areasThanks to these dividing walls, the flames have not reached other areas of the plant, where more recyclable material is stored that is susceptible to burning or being affected by high temperatures and smoke.

The center's staff collaborate with the firefighting teams by providing information about the arrangement of materials and internal accessThis allows firefighters to better plan the entry of vehicles and work equipment, as well as the opening of safe passageways within the premises.

Firefighter deployment and emergency coordination

They have all traveled to the scene of the incident twelve fire crews from the Community of MadridA considerable deployment reflects the scale of the fire and the need for sufficient personnel and resources to attack the flames from multiple fronts. These crews have worked in a coordinated manner on the two affected scrap metal piles.

The initial actions have focused on contain the advance of the fire and to prevent it from affecting a third section of the plant, also occupied by recycling materials. Firefighters managed to stop the spread, so the fire remained confined to the two initial piles, which was crucial in limiting the impact on the entire facility.

Emergency services 112 have taken over the general coordination of the operationmanaging the staggered arrival of resources and channeling information between the various services involved. From the control center, the progress of the tasks has been monitored, and the necessary communications have been issued to guarantee the safety of both those involved and the area surrounding the plant.

Throughout the entire operation, the teams have had to work with special caution, given that the Piles of processed scrap metal can collapse The debris is removed with heavy machinery to allow water and other extinguishing agents to reach the hotspots inside. This phase is slow and meticulous, as it is crucial to prevent any embers from reigniting the fire hours later.

Fire situation and firefighting efforts

Around mid-morning, authorities confirmed that the fire was located in control phaseAlthough personnel remained deployed in the area to complete the final stages of extinguishing the blaze. In these types of incidents, once the visible flames have been brought under control, it is necessary to continue working on removing and cooling the affected materials.

The firefighters have dedicated a good part of the day to remove and refresh the mountains of scrap metalby searching for hidden hotspots and continuously applying water to lower the temperature. This process is especially important when dealing with large, compacted volumes, where heat can become trapped inside and keep embers burning for a long time.

Despite the fire's dramatic development, with intense smoke emissions and a large deployment of resources, No casualties or personal injuries have been reportedThe absence of injuries has allowed efforts to focus exclusively on controlling the fire and protecting the structures and materials of the site.

Regional authorities noted that this event represents the second recent fire at a scrap metal facility in the Community of Madrid in a short period of time, after another plant in San Fernando de Henares registered a fire of similar characteristics where around 2.000 square meters of material were burned, also with the intervention of a dozen fire crews.

Health intervention and follow-up in the area

Alongside the firefighting efforts, other personnel have been maintained at the scene. SUMMA 112 health teams in preventative modeTheir mission has been to monitor for possible incidents among the participants and to be prepared in case any emergency assistance was needed, something that ultimately did not occur.

The fact that there has been no need to evacuate people or assist the injured has allowed for a more organized management of the security perimeterEven so, access controls have been put in place to ensure that only authorized personnel could enter the work area, minimizing added risks.

From an environmental and public safety perspective, emergency services have been monitoring the evolution of the column of smoke generated by the combustion of scrap metalIn situations like this, attention is paid to the wind direction and the possible impact on nearby population centers, although in this case no significant incidents have been reported on the health of the residents.

The relevant authorities may assess in the coming days whether it is necessary to carry out additional inspections at the recycling plant and review the internal security protocols, with the aim of reducing the risk of new incidents occurring in facilities with similar characteristics in the region.

The incident at the recycling plant in Torrejón de Velasco highlights the importance of having well-sectorized infrastructure, updated emergency plans, and a rapid response The coordinated action of the Madrid Community Fire Department, SUMMA 112 (Madrid's emergency medical service), and the regional emergency center allowed them to keep the fire under control, prevent its spread to other areas of the facility, and close the incident without personal injuries, despite the significant volume of scrap metal affected and the inherent complexity of this type of industrial fire.

Fire outside the Monzón recycling plant
Related article:
Fire outside the Monzón recycling plant